Lightning protection testing.

Annual inspection and testing to BS EN IEC 62305-3 and BS 7430. Costed on a minimum attendance for the visit, then a rate for every earth and down conductor location tested.

Test points

Count the test clamps or earth pits on the building. Most commercial buildings have between 4 and 30.

Separate test record per building, one attendance for the site.

  • Visual inspection of the air termination, down conductors and bonding.
  • Individual and combined earth resistance readings, and continuity testing.
  • Certificate with readings, next due date and any remedial recommendations.

Remedial works, access equipment and rope access are quoted separately once the inspection has identified what is needed.