London School of Hygiene and Tropical Medicine, Tavistock Place
Crane earth and lightning protection earth termination network to the TP2 building, with rods driven to 6 m and connected to the steel frame.
- Client
- Mechserv, on an 8Build site
- Location
- 15 to 17 Tavistock Place, King's Cross, London WC1H
- Sector
- Education
- Year
- 2021
6 m
Rod depth
2
Operatives on site
CAT and Genny
Every position swept
The challenge
A tight central London site at King's Cross with a tower crane that needed an independent earth, followed by the earth termination network for the building's lightning protection system. Underground services are dense in this part of Bloomsbury, so every rod position had to be surveyed and agreed before anything was driven. The work started in the week of 19 April 2021 under full Covid site controls, with staggered access slots and two metre working.
What we did
- Prepared the RAMS for a two man crew covering earth electrode installation, scaffold access, percussion tool use and the site's Covid procedures.
- Obtained the underground services drawing from the main contractor and swept every proposed electrode position with a calibrated CAT and Genny before driving. No electrode went in without the main contractor agreeing its final location.
- Drove the earth electrodes to an initial depth of 6 m using a 110 V hand held percussion hammer, sharing the work between operatives and logging trigger time to control hand arm vibration exposure.
- Connected the electrodes to the structural steel frame, so the frame and the earth work together as the building's path to ground, and provided the crane earth as a separate connection.
- Tested each electrode for earth resistance with a calibrated digital earth tester on completion and recorded the readings.
Outcome
A tested crane earth and earth termination network installed to BS EN 62305 and BS 7430 on a constrained central London site, with the building's lightning protection system completed and tested to the specification.
Standards
- BS EN 62305-3
- BS 7430:2011
- Earthing
- Protection
Related projects
Education · 2021
North Kent College, Dartford
Lightning protection to a new steel framed college building: frame bonded as the down conductor, 25 x 3 mm aluminium tape roof network and nine driven earth rods, delivered in four visits.
- Driven earth rods
- 9
- Site visits
- 4
- Estimated site time
- 4 days
Driven earth rods
Site visits
Estimated site time
Read case study
Education · 2020
Nonsuch High School for Girls, Cheam
Remedial lightning protection works to a steel framed school building during re roofing, using the frame as the down conductor and strike plates fitted after tiling.
- Frame bond centres
- 5 m
- Site visits
- 2
- External down tapes
- 0
Frame bond centres
Site visits
External down tapes
Read case study
Student accommodation · 2025 to 2026
Owlstone Croft, Cambridge
Design, supply, installation, testing and certification of six separate Class IV lightning protection systems to two accommodation blocks and four terraces, plus a UKPN substation earth.
- Structures protected
- 6
- Contract value
- £18,900
- Protection class
- IV
Structures protected
Contract value
Protection class
Read case study